Hi developers,
In the last weekend I investigated commits releated to current trunk
and sympa-6.2-branch (I worry if subversion server might be overloaded).
Below is estimated number of commits by category.
For detailed numbers see attached XLS.
-------------
bug: 315
change: 20
dev: 1639
feature: 55
release: 3
svn: 116
Unknown: 2
-------------
* e.g. "bug" means number of commits with [*bug], [bug] or [-bug] tag.
Another attachment is the figure describing our work after r7678
(Can you see SVG with Inkscape extension?).
- Timeline runs from top to bottom.
- Dots represent commits (red: bug fix; blue: svn work; black: other).
- Blue arrows represent merges between branches.
Later I'll make a small proposal about how to proceed our work.
Regards,
--- Soji
On Thu, 07 Nov 2013 16:14:04 +0100
David Verdin <address@concealed> wrote:
>
> Le 07/11/13 11:08, Guillaume Rousse a écrit :
> > Given my current work load, not before next week, unfortunatly.
> >
> > However, I don't undestand why this should be blocking for anyone. No
> > one ever said those changes had to be made before anything else, nor
> > than I was the only one that could perform them. That would be insane
> > constraints for a collaborative work where none of us has full-time
> > sympa involvement.
> Indeed. We only think that you're the best of us to do this, so we're
> lazily waiting for you.;-)
> But I think that we can do some of the files/directories moves that we I
> summed up in my preceding mail. I think that as long as we don't touch
> th sources, you can work quietly, Am I right.
> >
> >> Afterwards, we'll be able to install the 6.2 on our production server,
> >> then release a beta.
> > I initially though I was supposed to work on the trunk, which has been
> > already synced with 6.2 branch. And I was blocked by subversion ACLs
> > when I tried last week, which is part of the delay.
> We fixed the ACL problem. Soji and you should have now full rights on
> the whole Sympa project.
> >
> > If I'm making those changes in the 6.2 branch now, it means than I'll
> > have either to do the same work on trunk again, or the trunk will have
> > to be synced again, right ?
> That's the problem.
> You were very kind to accept to redo your work in the trunk. I don't
> want you to do it twice.
> I think it would be simpler to accept the 6.2 branch as it is right now
> instead of having to deal with yet another merge.
>
> I can move bug fixes manually for a few months if it means more comfort
> for you. And I think it does.
>
> Regards,
>
> David
>
> --
> A bug in Sympa? Quick! To the bug tracker!
> <https://sourcesup.renater.fr/tracker/?group_id=23>
> RENATER logo
> *David Verdin*
> Études et projets applicatifs
>
> Tél : +33 2 23 23 69 71
> Fax : +33 2 23 23 71 21
>
> www.renater.fr <http;//www.renater.fr>
> RENATER
> 263 Avenue du Gal Leclerc
> 35042 Rennes Cedex
>
>
>
--
株式会社 コンバージョン セキュリティ&OSSソリューション部 池田荘児
〒231-0004 神奈川県横浜市中区元浜町3-21-2 ヘリオス関内ビル7F
e-mail address@concealed TEL 045-640-3550
http://www.conversion.co.jp/
Attachment:
statistics-20131122.xls
Description: MS-Excel spreadsheet
Attachment:
commits-20131125.svg
Description: image/svg
-
[sympa-developpers] Layout of sources,
IKEDA Soji, 11/03/2013
-
Re: [sympa-developpers] Layout of sources,
Guillaume Rousse, 11/04/2013
-
Re: [sympa-developpers] Layout of sources,
IKEDA Soji, 11/05/2013
-
Re: [sympa-developpers] Layout of sources,
David Verdin, 11/06/2013
-
Re: [sympa-developpers] Layout of sources,
Guillaume Rousse, 11/07/2013
-
Re: [sympa-developpers] Layout of sources,
David Verdin, 11/07/2013
-
Re: [sympa-developpers] "Let's work together" plan ;) was Re: Layout of sources,
IKEDA Soji, 11/25/2013
- Re: [sympa-developpers] "Let's work together" plan ;) was Re: Layout of sources [fix], IKEDA Soji, 11/25/2013
-
Re: [sympa-developpers] "Let's work together" plan ;) was Re: Layout of sources,
IKEDA Soji, 11/25/2013
-
Re: [sympa-developpers] Layout of sources,
David Verdin, 11/07/2013
-
Re: [sympa-developpers] Layout of sources,
Guillaume Rousse, 11/07/2013
-
Re: [sympa-developpers] Layout of sources,
David Verdin, 11/06/2013
-
Re: [sympa-developpers] Layout of sources,
David Verdin, 11/06/2013
-
Re: [sympa-developpers] Layout of sources,
IKEDA Soji, 11/07/2013
-
Re: [sympa-developpers] Layout of sources,
Guillaume Rousse, 11/07/2013
- Re: [sympa-developpers] Layout of sources, David Verdin, 11/07/2013
-
Re: [sympa-developpers] Layout of sources,
David Verdin, 11/07/2013
-
Re: [sympa-developpers] Layout of sources,
IKEDA Soji, 11/08/2013
- Re: [sympa-developpers] Layout of sources, David Verdin, 11/08/2013
-
Re: [sympa-developpers] Layout of sources,
IKEDA Soji, 11/08/2013
- Re: [sympa-developpers] Layout of sources, David Verdin, 11/08/2013
-
Re: [sympa-developpers] Layout of sources,
IKEDA Soji, 11/08/2013
-
Re: [sympa-developpers] Layout of sources,
Guillaume Rousse, 11/07/2013
-
Re: [sympa-developpers] Layout of sources,
IKEDA Soji, 11/07/2013
-
Re: [sympa-developpers] Layout of sources,
IKEDA Soji, 11/05/2013
-
Re: [sympa-developpers] Layout of sources,
Guillaume Rousse, 11/04/2013
Archive powered by MHonArc 2.6.19+.